| Sampling Factors: |
Location: 2 sites (Pittsburgh, Kingston)
Customer (Not Relevant: Not relevant. No specific/distinct requirements based on customers)
Size (Not Relevant: All projects are categorized by size but in the organization scope defined all projects fall in the same category, therefore not relevant)
Organizational Structure (Not Relevant: Not relevant. Both sites are covered under the same org. structure)
Type of Work: Automatic People mover, MonoRail, Metros |
| Sampling Factor Values: |
PIT (Location): Pittsburgh site
KING (Location): Kingstion Site
APM (Type of Work): Automatic People Mover
MONO (Type of Work): MonoRail Systems
METRO (Type of Work): Metro Transit Systems |
| Subgroups: |
PIT_APM: APM projects
400 People, 4 Basic Units
– PIT
– APM
KING_MONO: MonoRail in Kingston site
200 People, 2 Basic Units
– MONO
– KING
KING_METRO: Metro projects in Kingston
199 People, 3 Basic Units
– KING
– METRO |