Sampling Summary:
(抽样汇总)
Sampling Factors: Location: Projects is done in collaboration with different sites
Customer (Not Relevant: All customers are public transport companies, managed in the same manner)
Size: Projects are divided into three groups (small, medium, large)
Organizational Structure (Not Relevant: Single structure, used for all projects in this small team)
Type of Work (Not Relevant: All work is mechanical and electrical engineering)
Sampling Factor Values: ZHPPC (Location): Work done in collaboration with Zurich
MAPPC (Location): Work done in collaboration with Mannheim
TRPPC (Location): Work done in collaboration with Trapaga
VAPPC (Location): Work done in collaboration with Vaesteraas
Small (Size): Projects < 2000=””>
Medium (Size): Projects between 2000 and 9000 h
Large (Size): Projects > 9000 h
Subgroups: ZH-M: Medium Zurich collaboration
5 People, 1 Basic Units
– ZHPPC
– Medium
MA-M: Medium Mannheim units
12 People, 2 Basic Units
– Medium
– MAPPC
MA-L: Large Mannheim units
7 People, 1 Basic Units
– MAPPC
– Large