CMMI认证

TRISTAR Engineering-2018-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All Project Management activities occur in Bloomington, IN)
Customer (Not Relevant: One project.)
Size (Not Relevant: One project.)
Organizational Structure (Not Relevant: Not relevant, organization is small)
Type of Work (Not Relevant: One project.)
Entire OU: All Projects- this value resulted in the creation of subgroup that contains all projects in the OU, i.e. two internal projects in the organization. No Projects- this value is null value, and results in a subgroup that contained no projects.
Sampling Factor Values: Entire OU (Entire OU): All Projects- this value resulted in the creation of subgroup that contains all projects in the OU, i.e. two internal projects in the organization.
No projects (Entire OU): No Projects- this value is null value, and results in a subgroup that contained no projects.
Subgroups: Subgroup 1: Entire OU.
4 People, 1 Basic Units
– Entire OU

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:TRISTAR Engineering-2018-CMMI3