CMMI认证

Ubiwhere-2016-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are managed from the same location, Aveiro (Portugal))
Customer (Not Relevant: Customer is not a relevant factor, because all projects used the same Quality System independently of the customer.)
Size (Not Relevant: Size is not a relevant factor, because there isn”t any tailoring or life cycle distinction based on size and all projects use the same quality system independently of the size.)
Organizational Structure (Not Relevant: Organizational structure is not a relevant factor, because all projects use the same quality system independly of the department or area of the organizational unit.)
Type of Work: The methodology is based on the type of work performed. According to that there are two type of project Research and Innovation and Client projects.
Sampling Factor Values: Research and Innovation (Type of Work): Projects that doesn’t have a client and typically are more related with research and innovation activities.
Client Projects (Type of Work): Projects that have a contract with an external customer.
Subgroups: Research an Innovation: Innovation projects contracted by a university or a european Union committee mainly investigation
13 People, 14 Basic Units
– Research and Innovation
Client Projects: Development or maintenance projects contracted by a single customer
8 People, 20 Basic Units
– Client Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Ubiwhere-2016-CMMI3