| Sampling Factors: |
Location (Not Relevant: Location is not relevant sampling factor because all work in done in Chengdu)
Customer (Not Relevant: Customer is not relevant sampling factor because all clients are medical)
Size (Not Relevant: Size is not relevant sampling factor because most projects belong to small)
Organizational Structure (Not Relevant: Not relevant because everybody report to the same GM)
Type of Work: Relevant because there are two life cycles used now, Waterfall and Waterfall Prototype |
| Sampling Factor Values: |
Waterfall (Type of Work): This is a life cycle used by the projects using Waterfall
Waterfall Prototype (Type of Work): This is a life cycle used by the projects using Waterfall + Prototype |
| Subgroups: |
Waterfall: This is a life cycle used by the projects using Waterfall
12 People, 3 Basic Units
– Waterfall
Waterfall Prototype: This is a life cycle used by the projects using Waterfall + Prototype
15 People, 3 Basic Units
– Waterfall Prototype |