CMMI认证

Velocis Systems Pvt. Ltd.-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Single location)
Customer (Not Relevant: While there may be a need for tailoring of the process because of specific customer requirements, there has never been a requirement from a customer that a specific process has to be followed. Thus, all projects follow the same process irrespective of customer.)
Size (Not Relevant: The quality management system requires projects to follow the same process irrespective of size – though specific tailoring will be done according to the needs of a project)
Organizational Structure (Not Relevant: This is one group where all follow the same process)
Type of Work (Not Relevant: All projects follow the same lifecycle)
Projects: In the absence of other sampling factors for differentiation between projects, Projects [‘Development’ and ‘Other’] has been taken. Other is a ‘NULL’ set.
Sampling Factor Values: Development (Projects): Development project
Other (Projects): NULL set
Subgroups: Development: Development project
44 People, 5 Basic Units
– Development

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Velocis Systems Pvt. Ltd.-2017-CMMI3