| Sampling Factors: |
Location (Not Relevant: No effect. Projects and support groups at same location in Shanghai)
Customer (Not Relevant: The products are developed as generic items. Currently no customer differentiation occurs.)
Size (Not Relevant: All small sized projects and no process differentiation occurs on the basis of size)
Organizational Structure (Not Relevant: All projects are conducted within the one department (Development Department). There is no impact from organisational structure on project differentiation)
Type of Work: Two types of Lifecycle model: waterfall and iteration model |
| Sampling Factor Values: |
Waterfall (Type of Work): Waterfall development model
Iteration (Type of Work): Iteration development model |
| Subgroups: |
Waterfall: Waterfall development
6 People, 1 Basic Units
– Waterfall
Iteration: Iteration development
14 People, 2 Basic Units
– Iteration |