CMMI认证

VSTECS Information Technology Service(Beijing)Co., Ltd-

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: OU located only in Beijing)
Customer (Not Relevant: The client only intervene in stating the requirements and receiving the product, so the organization is able to use its methodology and the process has been used in the same way)
Size (Not Relevant: All projects are similar size, work is not performed differently based on the size of the projects)
Organizational Structure (Not Relevant: The Software development structure for the organizational unit is simple, there is only one area of software development without sub-divisions)
Type of Work: Diference between Waterfall and Iteractive projects
Sampling Factor Values: Waterfall (Type of Work): Project using waterfall lifecycle model
Iteractive (Type of Work): Project using iteractive lifecycle model
Subgroups: Waterfall: Project using waterfall lifecycle model
9 People, 2 Basic Units
– Waterfall
Iteractive: Project using iteractive lifecycle model
8 People, 2 Basic Units
– Iteractive

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:VSTECS Information Technology Service(Beijing)Co., Ltd-