| Sampling Factors: |
Location (Not Relevant: No.All projects are developed on single site, so this is not a relevant sampling factor.)
Customer (Not Relevant: No. Similar customers within the tobacco industry, no difference.)
Size (Not Relevant: No. Size is not a relevant sampling factor, the same process is used for all projects.)
Organizational Structure (Not Relevant: No.All projects are conducted in the R&D Centre, so this is not a relevant sampling factor.)
Type of Work: Yes. The projects are divided into Manufacturing Type and ERP Type. |
| Sampling Factor Values: |
ERP Projects (Type of Work): Enterprise system projects for the tobacco industry
Manufacturing (Type of Work): Production control, factory, manufacturing management and equipment measurement projects for the tobacco industry |
| Subgroups: |
Manufacturing: Production control, factory, manufacturing management and equipment measurement projects for the tobacco industry
60 People, 6 Basic Units
– Manufacturing
ERP: Enterprise system projects for the tobacco industry
40 People, 4 Basic Units
– ERP Projects |