CMMI认证

Wuhan Public Electronic Project Co.,Ltd.-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not relevant: All work is completed in Wuhan. As such Location does not identify differentiating subgroups. Location is ruled out as a sampling factor.)
Customer (Not Relevant: Not Relevant: WHPE has two projects, both of which provide products to the same public customer. As such, customer is ruled out as a differentiating factor.)
Size (Not Relevant: Not Relevant: Both projects within the appraisal scope are of similar size both in terms of number of employees as well as size with respect to the value and amount of work being done . Size is not a differentiating factor.)
Organizational Structure (Not Relevant: Not Relevant: All work is performed within the same organizational labor and management structure. As such this does not become a differentiating sampling factor.)
Type of Work (Not Relevant: Not Relevant: All work is in development of electronic access systems. As such this is not a differentiating factor for sampling.)
Full Set: Applied Technology Department, Support Department and Testing Department
Sampling Factor Values: Entire OU (Full Set): Full Organizational Unit – as there are no differentiating factors that require separate subgroup sampling.
Null Set (Full Set): Null Set
Subgroups: Full Set: Full Set
16 People, 2 Basic Units
– Entire OU

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Wuhan Public Electronic Project Co.,Ltd.-2017-CMMI3