CMMI认证

Aplicaciones y Tratamientos de Sistemas S. A (AT SISTEM

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Location is not a determining or distinguishing factor affecting the implementation or performance of work because there is only one development method. Even there are members of the same development team in different locations.)
Customer (Not Relevant: Customers don”t influence in the methods used to develop software, because exists only one ATSISTEMAS Methodology for all the customers, and there is no a process tailoring related with customers.)
Size: (Relevant: Work is performed differently based on the size of the software project (software maintenance requests). Minor changes are managed as maintenance activities inside a maintenance service, while others are considered new or enhancement software development projects.)
Organizational Structure (Not Relevant: Process is not different depending on the activities of Departments, Divisions or Areas, so Organizational Structure is not a determining or distinguishing factor affecting the implementation or performance of work.)
Type of Work: (Relevant: Type of work is a determining or distinguishing factor affecting the implementation or performance of work, considering the following types of work: software development, software maintenance and professional services.)
Life Cycle: Life Cycle is a determining or distinguishing factor affecting the implementation or performance of work (Type of Life Cycle used in the project.)
Sampling Factor Values: Small (Size): Small changes are requested to solve little problems inside a software maintenance service. A request is considered small if the estimated duration is less than 100 hours.
Large (Size): A set of product features or large change requests are the base of software development projects, developed by request of the customer. The estimated duration is more than 100 hours
Software Project (Type of Work): Set of tasks to build a software product during an established time.
Maintenance (Type of Work): Set of change requests over an existing software product.
Professional Services (Type of Work): Time and material service based in skills categories.
Agile (Life Cycle): Project management method is based in SCRUM
Traditional (Life Cycle): Project management activities are based in traditional methodologies.
Subgroups: AGILE LIFE CYCLE: Projects based on SCRUM
49 People, 12 Basic Units
– Agile
– Large
– Software Project
TRADITIONAL LIFE CYCLE: Projects managed using traditional methodologies
187 People, 48 Basic Units
– Software Project
– Large
– Traditional

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Aplicaciones y Tratamientos de Sistemas S. A (AT SISTEM