CMMI认证

Yellow River Institute of Hydraulic Research-2019-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant: The scope of appraisal is only in cities of China and location so other locations are not considered for this appraisal.)
Customer (Not Relevant: Not Relevant: The QMS processes are established at organizational level and processes are not differentiating with customers and the scope of appraisal is only government customer types, there are no process distinctions made based on the customers.)
Size (Not Relevant: Not Relevant: All projects are averaged sizing.)
Organizational Structure (Not Relevant: Not Relevant: All projects are developed under only a division for SW development; therefore, the QMS processes are not different for all projects under this organization. So, this factor is not considered for project selection from all divisions. There are no process distinctions made based on the structure.)
Type of Work: Relevant: The types of work in this OU are categorized into 2 typical software development lifecycles. The SDLC are covered for SW development in the organizational scope which are 1) Waterfall model, and 2) Prototyping model.
Sampling Factor Values: Waterfall model (Type of Work): This factor is applicable the software development by using a Waterfall software development model which defined for the application development project as a Waterfall model.
Prototyping model (Type of Work): This factor is applicable the software development by using a Prototyping software development model which defined for the application development project as a Prototyping model.
Subgroups: Subgroup#01: Waterfall model: Projects used an application development process for Waterfall model Description: This subgroup is applicable the software development by using the Waterfall model.
27 People, 2 Basic Units
– Waterfall model
Subgroup#02: Prototyping model: Projects used an application development process for Prototyping model Description: This subgroup is applicable the software development by using the Prototyping model.
25 People, 1 Basic Units
– Prototyping model

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Yellow River Institute of Hydraulic Research-2019-CMMI3