Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: not relevant, all one location)
Customer (Not Relevant: all one customer type done the same way)
Size (Not Relevant: not relevant, it makes no difference how large the group is)
Organizational Structure (Not Relevant: all projects are structured the same)
Type of Work (Not Relevant: All the work is similar)
Work Size: large projects done differently (man months greater than 50 man-months)
Sampling Factor Values: Large (Work Size): man months greater than 50 man-months
Small (Work Size): man months smaller than 50 man-months
Subgroups: Bank – Large: Banking projects greater than 50 man-months
8 People, 1 Basic Units
– Large
Bank- Middle: Banking projects smaller than 50 man-months
16 People, 3 Basic Units
– Small