CMMI认证

Zhejiang Center Information Technology Co., Ltd.-2020-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Basic unit location has no effect in the way the activities are performed as they are performed in one single location)
Customer (Not Relevant: there is only internal customer need to be managed,so we can consider this factor has no influence in the way the activities are performed.)
Size (Not Relevant: Different size projects use the same process, so this factor is not considered.)
Organizational Structure (Not Relevant: Each project uses the same organizational structure,so we can consider this factor has no influence in the way the activities are performed.)
Type of Work: There are 2 type of projects, one is “Existing system maintenance project”, the other is “New system development project”.
Sampling Factor Values: Existing system maintenance project (Type of Work): This type of project performs function enhancement development on existing systems
New system development project (Type of Work): This type of project requires the development of a new software system and requires architectural design
Subgroups:
SG1: Existing system maintenance project
26 People, 4 Basic Units
– Existing system maintenance project
SG2: New system development project
20 People, 2 Basic Units
– New system development project

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Zhejiang Center Information Technology Co., Ltd.-2020-CMMI3