CMMI认证

Zhejiang Perfect Online Network Technology Co., LTD.-CM

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All management and development activities are conducted at one location in Ningbo, Zhejiang, China.)
Customer (Not Relevant: Although OU provides systems to several types of customers such as public and private, works for all customers are performed consistently using organizational standard processes.)
Size (Not Relevant: All projects within OU are small sized projects (All of sizes are less than 10 people). Consequently size does not cause significant variations in the performance of processes.)
Organizational Structure (Not Relevant: There is one organization structure with a common OSSP and quality system across all BUs in the organization regardless of the organizational structure.)
Type of Work: There are two types of Lifecycle models in software development process such as “Waterfall” and “Iterative” model. The major difference between these 2 types is the application of software development life cycle.
Sampling Factor Values: Waterfall Development (Type of Work): Refers to SDLC Waterfall Model
Iterative Development (Type of Work): Refers to SDLC Iterative Model
Subgroups: Waterfall: This subgroup comprises all development projects using waterfall model in SDLC.
18 People, 3 Basic Units
– Waterfall Development
Iterative: This subgroup comprises all development projects using iterative model in SDLC.
7 People, 1 Basic Units
– Iterative Development

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Zhejiang Perfect Online Network Technology Co., LTD.-CM