| Sampling Factors: |
Location (Not Relevant: Not Relevant. Only One Location, Huaian City)
Customer (Not Relevant: Not Relevant. All projects work with the Huaian city government to implement the smart / intelligent city frameworks.)
Size (Not Relevant: Not Relevant. All team sizes in the range of 7 to 8/9 and project duration varies between 6 to 7 months. Does not introduce diversity.)
Organizational Structure (Not Relevant: Not Relevant. All projects part of the Technology Department)
Type of Work (Not Relevant: Not Relevant. All Projects in scope are Development Projects.)
Lifecycle Model: There are two Lifecycle models, Waterfall and Iterative that are used by the projects which introduce diversity |
| Sampling Factor Values: |
Waterfall LC Model (Lifecycle Model): Projects using Waterfall LC Model
Iterative LC Model (Lifecycle Model): Projects using Iterative LC Model |
| Subgroups: |
G1: Waterfall LC Model based Projects
14 People, 2 Basic Units
– Waterfall LC Model
G2: Iterative LC Model Projects
8 People, 1 Basic Units
– Iterative LC Model |