CMMI认证

Beijing Ether Peony Elec.Eng. Co., Ltd-2018-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: No relevant. All projects are in the same location.)
Customer (Not Relevant: No relevant. All projects are commercial customers.)
Size (Not Relevant: No relevant. All projects are similar size.)
Organizational Structure (Not Relevant: No relevant. One R&D development.)
Type of Work (Not Relevant: No relevant. There is only one type of work in R&D activities.)
Duration: Development duration how long the work is to be performed. Short duration is less than 5 months, medium duration is between 5 months and 12 months.
Sampling Factor Values: Short (Duration): Short duration is less than 5 months.
Medium (Duration): Medium duration is between 5 months and 12 months.
Subgroups: Medium: Development duration is more than 5 months and less than 12 months
6 People, 1 Basic Units
– Medium
Short: Public Security Data Center Room Construction Project is mainly includes: machine room fine decoration engineering, power supply and distribution system, air conditioning system, monitoring room alarm system, computer room lightning protection and grounding protection system, fire fighting system, generic cabling system, cabinet system, IT hardware system, shielding room construction.
10 People, 2 Basic Units
– Short