Organization Name:
(组织名称) Beijing Ether Peony Elec.Eng. Co., Ltd
(组织名称) Beijing Ether Peony Elec.Eng. Co., Ltd
Organizational Unit:
(组织单位) Research and Development Center
(组织单位) Research and Development Center
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Apr 27, 2018
(评估结束日期) Apr 27, 2018
Lead Appraiser:
(主任评估师) Yoshikazu Shinkai
(主任评估师) Yoshikazu Shinkai
Sponsor:
(发起人) Hongyue Liu
(发起人) Hongyue Liu
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: No relevant. All projects are in the same location.)
Customer (Not Relevant: No relevant. All projects are commercial customers.)
Size (Not Relevant: No relevant. All projects are similar size.)
Organizational Structure (Not Relevant: No relevant. One R&D development.)
Type of Work (Not Relevant: No relevant. There is only one type of work in R&D activities.)
Duration: Development duration how long the work is to be performed. Short duration is less than 5 months, medium duration is between 5 months and 12 months.Sampling Factor Values: Short (Duration): Short duration is less than 5 months.
Medium (Duration): Medium duration is between 5 months and 12 months.Subgroups: Medium: Development duration is more than 5 months and less than 12 months
6 People, 1 Basic Units
– Medium
Short: Public Security Data Center Room Construction Project is mainly includes: machine room fine decoration engineering, power supply and distribution system, air conditioning system, monitoring room alarm system, computer room lightning protection and grounding protection system, fire fighting system, generic cabling system, cabinet system, IT hardware system, shielding room construction.
10 People, 2 Basic Units
– Short
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。