| Sampling Factors: |
Location (Not Relevant: Not relevant all projects developed in the same location)
Customer (Not Relevant: Not relevant the same process is used for all customers)
Size: 3 size of projects small, medium and large based on estimated men days
Organizational Structure (Not Relevant: Not relevant all projects are under the same management structure)
Type of Work: 3 key types of product are developed |
| Sampling Factor Values: |
Large (Size): Project is estimated to be more than 1000 man-days
Medium (Size): Projects estimated to be between 500-1000 man-days
Small (Size): Projects estimated to be less than 500 man-days
AFC (Type of Work): Auto Fare Collection
ACC (Type of Work): AFC Clearing Center
PIS (Type of Work): Passenger Information System |
| Subgroups: |
Large/PIS: Passenger Information System projects estimated to be more than 1000 man-days
20 People, 1 Basic Units
– Large
– PIS
Medium/ACC: AFC Clearing Center projects estimated to be between 500-1000 man-days
10 People, 1 Basic Units
– ACC
– Medium
Small/AFC: Auto Fare Collection projects estimated to be less than 500 man-days
6 People, 1 Basic Units
– Small
– AFC |