Beijing BII-ERG Transportation Technology Co., Ltd. /ER

CMMI认证查询 cmmirz 11年前 (2015-11-24) 784次浏览 0个评论
Organization Name:
(组织名称)
Beijing BII-ERG Transportation Technology Co., Ltd. /ERG Transit Systems(China)Ltd.
Organizational Unit:
(组织单位)
Research and Development
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Nov 25, 2015
Lead Appraiser:
(主任评估师)
Paul Iredale
Sponsor:
(发起人)
Yu Liu
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not relevant all projects developed in the same location)
Customer (Not Relevant: Not relevant the same process is used for all customers)
Size: 3 size of projects small, medium and large based on estimated men days
Organizational Structure (Not Relevant: Not relevant all projects are under the same management structure)
Type of Work: 3 key types of product are developed
Sampling Factor Values: Large (Size): Project is estimated to be more than 1000 man-days
Medium (Size): Projects estimated to be between 500-1000 man-days
Small (Size): Projects estimated to be less than 500 man-days
AFC (Type of Work): Auto Fare Collection
ACC (Type of Work): AFC Clearing Center
PIS (Type of Work): Passenger Information System
Subgroups: Large/PIS: Passenger Information System projects estimated to be more than 1000 man-days
20 People, 1 Basic Units
– Large
– PIS
Medium/ACC: AFC Clearing Center projects estimated to be between 500-1000 man-days
10 People, 1 Basic Units
– ACC
– Medium
Small/AFC: Auto Fare Collection projects estimated to be less than 500 man-days
6 People, 1 Basic Units
– Small
– AFC

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Beijing BII-ERG Transportation Technology Co., Ltd. /ER
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址