CMMI认证

CSRA, Inc.-2018-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The CSRA projects in the sample implement their processes regardless of their geographic location.)
Customer (Not Relevant: All CSRA projects perform that work directly for Federal or State Government clients in a ‘Prime’ contractor status or managing the delivery of the project with the standard processes)
Size (Not Relevant: All CSRA projects that are equal to or greater than 8 FTEs execute the organizational processes.)
Organizational Structure (Not Relevant: The CSRA organization is flat, with little difference between the projects’ process execution due to org structure.)
Type of Work (Not Relevant: All projects generally perform the same kind of work. No process distinction based on type of work.)
All Basic Units: All Basic Units where CSRA controls the processes
Sampling Factor Values: All Basic Units (All Basic Units): All Basic Units where CSRA control the process.
No Basic Units (All Basic Units): No Basic Units
Subgroups: Operations (Services): This Subgroup contains four sampled projects that follow the CSRA processes and have size equal or greater than 8 FTEs
658 People, 4 Basic Units
– All Basic Units

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:CSRA, Inc.-2018-CMMI3