CMMI认证

GMV-2016-CMMI5

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Projects may be developed with teams based on the same site, or in a multi site distribution, based on the needs and expectations stated by the customer, however, processes are common in any of the situations)
Customer (Not Relevant: Aerospace and Defense customer show a similar use of development processes, based on their own development lifecycles.)
Size (Not Relevant: there is no difference in the way processes are implemented based on the size of the project, mainly due to the fact that only Operational Systems are considered in the sample)
Organizational Structure: There are two business units with independent management structures
Type of Work (Not Relevant: The scope of the OU only considers the development of Operational Systems)
Development paradigm: QPPOs are cross-company defined however; development paradigms influence significantly the way in which processes are adapted to projects, and consequently PPBs
Sampling Factor Values: Aerospace (Organizational Structure): Projects developed within the Aerospace Industrial Directorate
Defence & Security (Organizational Structure): Projects developed within the Defense and Security Industrial Directorate
Development from scratch (Development paradigm): Projects developed from scratch, based on customer specifications
Product based development using Higfly (Development paradigm): Projects based on the in-house developed product Hifly
Product based development using Focus (Development paradigm): Projects based on the in-house developed product Hifly
Product based development using Flexplan (Development paradigm): Projects based on the in-house developed product Flexplan
Subgroups: 1. A. DS: Operational projects developed from scratch in the Aerospace business unit
345 People, 17 Basic Units
– Aerospace
– Development from scratch
2. A. DP. H: Operational projects, based on the product Hifly, in the Aerospace business unit
43 People, 6 Basic Units
– Product based development using Higfly
– Aerospace
3. A. DP. FO: Operational projects, based on the product Focus, in the Aerospace business unit
50 People, 5 Basic Units
– Aerospace
– Product based development using Focus
4. A. DP. FL: Operational projects, based on the product Flexplan, in the Aerospace business unit
14 People, 6 Basic Units
– Product based development using Flexplan
– Aerospace
5. D&S. DS: Operational projects developed from scratch in the Defense and Security business unit
132 People, 7 Basic Units
– Defence & Security
– Development from scratch

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:GMV-2016-CMMI5