CMMI认证

Aselsan MGEO-2014-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All MGEO projects reside at the same geographical site)
Customer (Not Relevant: All MGEO work is provided under one DOD customer.)
Size (Not Relevant: All MGEO projects use common processes regardless of size (# of personnel and duration))
Organizational Structure (Not Relevant: MGEO is structured under one CEO. The Engineering directorate structured as Systems Engineering, Hardware Engineering and Software Engineering. These groups provide the resources to conduct of projects across the entire organization)
Type of Work: There are three types of work performed within MGEO: o Product Development, o System Development, o System Integration
Sampling Factor Values: PD (Type of Work): Product Development Projects
SD (Type of Work): Systems Development Projects
SI (Type of Work): Systems Integration Projects
Subgroups: Product Development: Projects that are responsible for the development of a product including all diciplines of engineering.
111 People, 5 Basic Units
– PD
Systems Development: Projects responsible for the development of systems or subsystems including systems, software, and hardware engineering disciplines.
227 People, 4 Basic Units
– SD
Systems Integration: Projects responsible for the integration of systems for the customer.
15 People, 1 Basic Units
– SI

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Aselsan MGEO-2014-CMMI3