Sampling Factors: Location (Not Relevant: All work is performed in the same location. so location is not a relevant sampling factor)
Customer (Not Relevant: All work is performed for and delivered to the same customer, so customer is not a relevant sampling factor.)
Size (Not Relevant: All CSRs are roughly the same size, so size is not a relevant sampling factor)
Organizational Structure (Not Relevant: There is only one organizational structure for delivering the work, so org structure is not a relevant sampling factor)
Type of Work (Not Relevant: The work performed is system maintenance, processing CSRs, so type of work is not a relevant sampling factor)
Part: This sampling factor is defined in order to make SAS work since there no relevant sampling factors
Sampling Factor Values: SM 1 (Part): CSRs processed for Reception System, Sorting System, Departure & Arrival System, Transportation System, Delivery System, and Customer Service System applications. Even though there is no differentiation in process implementation, I have separated basic units for enhanced transparency.
SM 2 (Part): CSRs processed for Shopping Mall System, Postal Service System, Shipping & Delivery Service System, Email & Others System, and Contract Customer Services applications. Even though there is no differentiation in process implementation, I have separated basic units for enhanced transparency.
Subgroups: SM 1 CSRs: CSRs processed by SM 1
28 People, 1 Basic Units
– SM 1
SM 2 CSRs: CSRs processed by SM 2
31 People, 1 Basic Units
– SM 2