CMMI认证

Tianjin Richsoft Electric Power Information Technology

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are worked in the same location, so this is not a relevant sampling factor)
Customer (Not Relevant: All projects are worked in the same type of customer, so this is not a relevant sampling factor)
Size (Not Relevant: All projects are approximately the same size, so this is not a relevant sampling factor)
Organizational Structure (Not Relevant: All projects are worked by the same group, so organizational structure is not a relevant sampling factor)
Type of Work: Hypothesis testing of process performance parameters indicates that there is a significant difference in performance between new development projects and upgrade projects.
Sampling Factor Values: New Project (Type of Work): New development projects
Upgrade and Maintain (Type of Work): Upgrade and Maintain
Subgroups: A: New Development Projects
101 People, 6 Basic Units
– New Project
B: Upgrade and Maintain
32 People, 2 Basic Units
– Upgrade and Maintain

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Tianjin Richsoft Electric Power Information Technology