| Sampling Factors: |
Location (Not Relevant: All the projects are being developed from the company headquarters)
Customer: Projects developed for end customers follow a different cycle that those developed internally as a result of an RD initiative
Size (Not Relevant: Size is shadowed by the type of work, being the SPC projects in the same range of size, and the ICC systems also in a similar size. In consequence the factor is considered only associated to the Type of Work factor.)
Organizational Structure (Not Relevant: All the divisions work with the same organizational structure.)
Type of Work: There are two kinds of lines of activities, projects for developing static power converters, and projects for developing information, command and control systems. |
| Sampling Factor Values: |
EC (Customer): Projects developed for external customers, considering a complete delivery cycle.
RD (Customer): Projects developed as the result of internal RD initiatives.
SPC (Type of Work): Development of Static Power Converters
ICC (Type of Work): Development of Information, Command and Control Systems. |
| Subgroups: |
1. EC.SPC: Projects for developing static power converters, for external customers
51 People, 8 Basic Units
– EC
– SPC
2. EC.ICC: Projects for developing information, command and control systems, for external customers.
54 People, 7 Basic Units
– ICC
– EC
3. RD.ICC: Projects for developing information, command and control systems in the framework of internal RD initiatives.
11 People, 1 Basic Units
– RD
– ICC |