CMMI认证

Shanxi Pengtong Construction Project Management Co., Lt

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The OU has only one location)
Customer (Not Relevant: There is only internal customer need to be managed)
Size (Not Relevant: Different size projects use the same process)
Organizational Structure (Not Relevant: Each project follow the same organizational structure.)
Type of Work: There are 2 type of projects, one is “Existing system maintenance project”, the other is “New system development project”.
Sampling Factor Values: Existing system maintenance project (Type of Work): This type of project performs function enhancement development on existing systems
New system development project (Type of Work): This type of project requires the development of a new software system and requires architectural design
Subgroups: SG1: existing system maintenance project
12 People, 3 Basic Units
– Existing system maintenance project
SG2: New system development project
19 People, 2 Basic Units
– New system development project

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Shanxi Pengtong Construction Project Management Co., Lt