Shanxi Pengtong Construction Project Management Co., Lt

CMMI认证查询 cmmirz 10个月前 (02-17) 149次浏览 0个评论
Organization Name:
(组织名称)
Shanxi Pengtong Construction Project Management Co., Ltd.
Organizational Unit:
(组织单位)
R&D projects
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Feb 18, 2020
Lead Appraiser:
(主任评估师)
Qingping Yuan
Sponsor:
(发起人)
yue wang
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The OU has only one location)
Customer (Not Relevant: There is only internal customer need to be managed)
Size (Not Relevant: Different size projects use the same process)
Organizational Structure (Not Relevant: Each project follow the same organizational structure.)
Type of Work: There are 2 type of projects, one is “Existing system maintenance project”, the other is “New system development project”.
Sampling Factor Values: Existing system maintenance project (Type of Work): This type of project performs function enhancement development on existing systems
New system development project (Type of Work): This type of project requires the development of a new software system and requires architectural design
Subgroups: SG1: existing system maintenance project
12 People, 3 Basic Units
– Existing system maintenance project
SG2: New system development project
19 People, 2 Basic Units
– New system development project

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Shanxi Pengtong Construction Project Management Co., Lt
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址