CMMI认证

5-2016-D Systems, Inc-2016-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work for the OU is performed at the Round Rock campus)
Customer (Not Relevant: No difference in process is due to Customer requirements at this point)
Size (Not Relevant: All projects in scope are similar in size and the differences do not imply process differences)
Organizational Structure (Not Relevant: All projects follow the same organizational structure guidelines)
Type of Work (Not Relevant: All work is unmanned aircraft related)
Uniqueness: All projects are of the same type For the method we define 2 Factors: – All Projects (The general category all projects belong to) – No Projects (The empty set)
Sampling Factor Values: All Projects (Uniqueness): – All Projects (The general category all projects belong to)
No Projects (Uniqueness): – No Projects (The empty set)
Subgroups: All Projects: All projects are of the same type
9 People, 3 Basic Units
– All Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:5-2016-D Systems, Inc-2016-CMMI3