CMMI认证

WR Systems Ltd.-2015-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Work performed at a two locations (Norfolk and Fairfax, VA) is done identically.)
Customer (Not Relevant: All work is performed similarly for all customers.)
Size: Projects are initially categorized as P1, P2, or P3 based on project type. That initial categorization is then adjusted based on an assessment of risk factors, project size and value, and contract type.
Organizational Structure (Not Relevant: All work is performed within a single organizational unit)
Type of Work (Not Relevant: All work involves systems engineering and software development.)
Sampling Factor Values: P2 (Medium size/complexity) (Size): P2 projects include Level of Effort or Services/People Placement projects. P2 projects with Length < 6=”” months=”” and/or=”” value=””>< $10k=”” may=”” downgrade=”” to=”” p1.=”” p2=”” projects=”” with=”” length=””> 1 year and/or Value > $50K may upgrade to P3, if it is determined that the size and/or value of the project constitutes a risk factor.
P3 (Large size/complexity) (Size): P3 projects include Software/Systems Engineering with multiple defined deliverables, Non-SW/SE with defined phases and multiple defined deliverables, and projects that need to be CMMI® – DEV compliant. P3 projects with Length < 6=”” months=”” and/or=”” value=””>< $10k=”” may=”” downgrade=”” to=”” p2,=”” if=”” there=”” are=”” no=”” additional=”” high=”” risk=””>
P1 (Small projects) (Size): P1 projects include One-time Purchase/ Procurements and VAR/Product Support. P1 projects with Length > 1 year and/or Value > $50K may upgrade to P2, if it is determined that the size and/or value of the project constitutes a risk factor.
Subgroups: P2 projects: Projects of medium size, risk and complexity
81 People, 8 Basic Units
– P2 (Medium size/complexity)
P3 projects: Projects of large size, risk, and complexity
45 People, 3 Basic Units
– P3 (Large size/complexity)

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:WR Systems Ltd.-2015-CMMI3