Organization Name:
(组织名称) WR Systems Ltd.
(组织名称) WR Systems Ltd.
Organizational Unit:
(组织单位) Systems Operations
(组织单位) Systems Operations
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Oct 30, 2015
(评估结束日期) Oct 30, 2015
Lead Appraiser:
(主任评估师) Richard Waina
(主任评估师) Richard Waina
Sponsor:
(发起人) Brad Golden
(发起人) Brad Golden
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Work performed at a two locations (Norfolk and Fairfax, VA) is done identically.)
Customer (Not Relevant: All work is performed similarly for all customers.)
Size: Projects are initially categorized as P1, P2, or P3 based on project type. That initial categorization is then adjusted based on an assessment of risk factors, project size and value, and contract type.
Organizational Structure (Not Relevant: All work is performed within a single organizational unit)
Type of Work (Not Relevant: All work involves systems engineering and software development.)Sampling Factor Values: P2 (Medium size/complexity) (Size): P2 projects include Level of Effort or Services/People Placement projects. P2 projects with Length < 6=”” months=”” and/or=”” value=””>< $10k=”” may=”” downgrade=”” to=”” p1.=”” p2=”” projects=”” with=”” length=””> 1 year and/or Value > $50K may upgrade to P3, if it is determined that the size and/or value of the project constitutes a risk factor.
P3 (Large size/complexity) (Size): P3 projects include Software/Systems Engineering with multiple defined deliverables, Non-SW/SE with defined phases and multiple defined deliverables, and projects that need to be CMMI® – DEV compliant. P3 projects with Length < 6=”” months=”” and/or=”” value=””>< $10k=”” may=”” downgrade=”” to=”” p2,=”” if=”” there=”” are=”” no=”” additional=”” high=”” risk=””>
P1 (Small projects) (Size): P1 projects include One-time Purchase/ Procurements and VAR/Product Support. P1 projects with Length > 1 year and/or Value > $50K may upgrade to P2, if it is determined that the size and/or value of the project constitutes a risk factor.Subgroups: P2 projects: Projects of medium size, risk and complexity
81 People, 8 Basic Units
– P2 (Medium size/complexity)
P3 projects: Projects of large size, risk, and complexity
45 People, 3 Basic Units
– P3 (Large size/complexity)
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。
