| Sampling Factors: |
Location (Not Relevant: Not relevant. No Standard processes distinctions made based upon location.)
Customer (Not Relevant: Not relevant. No Standard processes distinctions made based upon attributes of the customer.)
Size: Projects are small (S), medium (M), or large (L) based upon program type categories. Size is defined as a function of FTE. Small consists of FTEs 2 to3; Medium consists of FTEs >3 up to 5; and Large consists of FTEs greater than 5.
Organizational Structure (Not Relevant: Not relevant. The Organizational Structure was analyzed and determined that it does not drive differences in how the work is performed.)
Type of Work (Not Relevant: Not relevant. No Standard processes distinctions made based upon program type of work which includes production, product/development, internal research and development.) |
| Sampling Factor Values: |
Small (Size): Small consists of FTEs 2 to3
Medium (Size): Medium consists of FTEs >3 up to 5
Large (Size): Large consists of FTEs greater than 5 |
| Subgroups: |
Small: This subgroup consists of basic units that have full time equivalents 2 to 3.
6 People, 3 Basic Units
– Small
Medium: This subgroup consists of basic units that have full time equivalents > 3 and up to 5.
21 People, 6 Basic Units
– Medium
Large: This subgroup consists of basic units that have full time equivalents > 5.
103 People, 7 Basic Units
– Large |