CMMI认证

Fujian Wanwei New Energy Electric Power Co., Ltd.-2015-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: the company has only one location.)
Customer (Not Relevant: the company has only one customer.)
Size: Large projects of 8 or more people. Small projects of less than 8 people. Different requirements and design process documents are used for each.
Organizational Structure (Not Relevant: the same process is used throughout the OU.)
Type of Work (Not Relevant: all development work follows the same process.)
Sampling Factor Values: Large (Size): Projects of 8 or more people.
Small (Size): Projects of less than 8 people.
Subgroups: Large: Projects have 8 or more people
12 People, 1 Basic Units
– Large
Small: Projects have less than 8 people
7 People, 1 Basic Units
– Small

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Fujian Wanwei New Energy Electric Power Co., Ltd.-2015-CMMI3