CMMI认证

YGSOFT Inc.-2018-CMMI5

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All the projects are managed and delivered out of one location, Zhuhai, China)
Customer (Not Relevant: Only have one type of customers in power system industry.)
Size: Projects are categorized by size: 1. The project peak team size greater than 14 FTEs; 2. The project peak team size between 5 to 14 FTEs. Two separate PPBs are maintained.
Organizational Structure (Not Relevant: GRIS Department has many sub products, they are part of the same large product (group resource management software GRIS). Each project is responsible for developing a sub product of GRIS. So organization is flat the simple, and it has no impact on project execution.)
Type of Work (Not Relevant: Only cover development projects)
Sampling Factor Values: Large (Size): Project peak team size greater than 14 FTEs
Small (Size): Project peak team size between 5-14 FTEs
Subgroups: S1: The large projects
76 People, 5 Basic Units
– Large
S2: The small projects
95 People, 10 Basic Units
– Small

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:YGSOFT Inc.-2018-CMMI5