AMBISIG-2015-CMMI5

CMMI认证查询 cmmirz 11年前 (2015-05-06) 943次浏览 0个评论
Organization Name:
(组织名称)
AMBISIG
Organizational Unit:
(组织单位)
Development Team
Maturity Level:
(成熟度)
Maturity Level 5
Appraisal End Date:
(评估结束日期)
May 07, 2015
Lead Appraiser:
(主任评估师)
Giuseppe Satriani
Sponsor:
(发起人)
Vasco Ferreira
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Standard activities, they not depends on the geographical location. Moreover the unique location is Lisbon)
Customer (Not Relevant: The Development Team concept is to have standardised activities, not depending on the customers or business areas; sometimes, specific customers have specific adaptations that do not affect in a significant way the standard process)
Size (Not Relevant: Micro and Small type of projects have been explicitally excluded from the appraisal scope; the differences between Medium and Large type of projects are not so significant because are limited to some section of documents; all the management and engineering process are executed in the same way)
Organizational Structure: The technical aspects of the projects belonging to BPM, Intranet and GIS areas are different enough to derive significant differences especially in engineering PAs
Type of Work (Not Relevant: Only development projects have been included in the appraisal scope)
Re-use: Re-Use – there are significant differences in project management as well as in technical practices if a project uses or not Reuse practices during the TS activity
Sampling Factor Values: BPM (Organizational Structure): Projects with source in BPM area
GIS (Organizational Structure): Projects with source in SIG area
Intranet (Organizational Structure): Projects with source in Consultancy area This factor is not used in the remaining subgroup because: – This type of project does not admit the REUSE value Intranet – The subgroup Intranet/NoReuse has no projects and the past year also had no projects. So it has been excluded from the sample
Reuse (Re-use): Project with a significant level of code reuse
No-Reuse (Re-use): Projects with no or few level of code reuse
Subgroups: BPM-Reuse: Projects with source in BMP area with a significant level of code reuse
10 People, 4 Basic Units
– BPM
– Reuse
BPM no-Reuse: BPM type of projects with no architectural reuse of proprietary “basic products”
15 People, 5 Basic Units
– No-Reuse
– BPM
GIS no-Reuse: GIS type of projects with no architectural reuse of proprietary “basic products”
3 People, 1 Basic Units
– GIS
– No-Reuse
GIS Reuse: GIS type of projects with some level of architectural reuse of proprietary “basic products”
3 People, 1 Basic Units
– Reuse
– GIS

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:AMBISIG-2015-CMMI5
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址