B3 Group, Inc.-2019-CMMI3

CMMI认证查询 cmmirz 7年前 (2019-09-09) 793次浏览 0个评论
Organization Name:
(组织名称)
B3 Group, Inc.
Organizational Unit:
(组织单位)
Information Technology and Professional Services
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Sep 10, 2019
Lead Appraiser:
(主任评估师)
Mark Schilling
Sponsor:
(发起人)
Dwight Hunt
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: all application development work within the organizational unit is performed in only one geographical location, Hendon, VA and is performed using the B3 Group standard defined set of organizational processes and procedures from which a project’s defined process is established. Therefore, location does not drive differences in conditions under which work is performed by a basic unit or support function.)
Customer (Not Relevant: all application development work within the organizational unit is performed for US Federal Government agencies and is performed using the B3 Group standard defined set of organizational processes and procedures from which a project’s defined process is established. Therefore, customer does not drive differences in conditions under which work is performed by a basic unit or support function.)
Size (Not Relevant: all application development work within the organizational unit is not performed differently based on the size of the basic units or support functions and is performed using the B3 Group standard defined set of organizational processes and procedures from which a project’s defined process is established. Therefore, size does not drive differences in conditions under which work is performed by a basic unit or support function.)
Organizational Structure (Not Relevant: within the organizational unit there is only one organizational structure in which all application development work use the B3 Group standard defined set of organizational processes and procedures from which a project’s defined process is established. Therefore, organizational structure does not drive differences in conditions under which work is performed by a basic unit or support function.)
Type of Work: application development work within the organizational unit is performed differently based on the following “type of work”: • “Scrum” work utilizes a type of Agile Scrum Method with project tasks performed in a sprint cycle of about four weeks duration. • “Hybrid” work utilizes a type of Hybrid Agile Method with development tasks performed in a sprint cycle of about two weeks duration.
Sampling Factor Values: Scrum (Type of Work): Project tasks are performed in a sprint cycle of about four weeks duration. Each sprint includes planning, requirements analysis, design, development, testing, acceptance evaluation tasks, and deployment of product components to a production environment.
Hybrid (Type of Work): Project tasks are performed in a sprint cycle of about two weeks duration which typically include planning, requirements analysis, design, development, testing, and acceptance evaluation tasks. A Requirements Backlog of User Stories was established at the beginning of the project and is reviewed prior to each sprint to establish a plan of items to work on for a sprint cycle.
Subgroups: Scrum: An Agile Scrum lifecycle type of work is used to perform application development for US Federal government agencies. Work is performed by B3 Group in Hendon, VA.
14 People, 1 Basic Units
– Scrum
Hybrid: A Hybrid lifecycle of work is used to perform application development for US Federal government agencies. Work is performed by B3 Group in Hendon, VA.
21 People, 2 Basic Units
– Hybrid

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:B3 Group, Inc.-2019-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址