Organization Name:
(组织名称) BEIJING HUADIANTIANREN ELECTRIC POWER TECHNOLOGY CO., LTD.
(组织名称) BEIJING HUADIANTIANREN ELECTRIC POWER TECHNOLOGY CO., LTD.
Organizational Unit:
(组织单位) R&D Center
(组织单位) R&D Center
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Jun 29, 2018
(评估结束日期) Jun 29, 2018
Lead Appraiser:
(主任评估师) Pimporn Hanchanlert
(主任评估师) Pimporn Hanchanlert
Sponsor:
(发起人) Shuyuan Liu
(发起人) Shuyuan Liu
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Single location-Beijing, China)
Customer (Not Relevant: Focus customers – All customers are from Electric Power.)
Size (Not Relevant: All size projects follow the same standard process.)
Organizational Structure (Not Relevant: All works are done under R&D Center.)
Type of Work: The company classifies works into two types which are different by Technical Solution: New Development: This project has new design and development for new requirement demand. It needs to use a new technology. The system architecture design is new. Maintenance Development: This project upgrades existing system based on system architecture remains unchanged, technical work is very stable.Sampling Factor Values: New Development (Type of Work): This project has new design and development for new requirement demand. It needs to use a new technology. The system architecture design is new.
Maintenance Development (Type of Work): This project upgrades existing system based on. System architecture remains unchanged, technical work is very stable.Subgroups: A: New development projects.
25 People, 4 Basic Units
– New Development
B: Maintenance projects
18 People, 2 Basic Units
– Maintenance Development