Organization Name:
(组织名称) Beijing Yuantong Power Technology Co.,Ltd.
(组织名称) Beijing Yuantong Power Technology Co.,Ltd.
Organizational Unit:
(组织单位) SW Development Units
(组织单位) SW Development Units
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Jan 23, 2017
(评估结束日期) Jan 23, 2017
Lead Appraiser:
(主任评估师) Tachanun Kangwantrakool
(主任评估师) Tachanun Kangwantrakool
Sponsor:
(发起人) Zaihu Jin
(发起人) Zaihu Jin
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Not Relevant: The scope of appraisal is only in Beijing, China, and location so other locations are not considered for this appraisal.)
Customer (Not Relevant: Not Relevant: The QMS processes are established at organizational level and processes are not differentiating with customers and the scope of appraisal is only Commercial & Government customer types , There are no process distinctions made based on the customers)
Size (Not Relevant: Not Relevant: All projects are averaged sizing)
Organizational Structure (Not Relevant: Not Relevant: All projects are developed under only a division for SW development; therefore the QMS processes are not different for all projects under this organization. So this factor is not considered for project selection from all divisions. There are no process distinctions made based on the structure)
Type of Work (Not Relevant: Not Relevant: There is only one type of typical work conducted in the org processes)
Lifecycle: Relevant: The SW development life-cycles are categorized into 2 life cycles types in the org. are covered for SW development in the organizational scope which are Waterfall and Iterative The QMS processes are different for between projects under this organization. 1) Waterfall 2) IterativeSampling Factor Values: software development by the Waterfall process (Lifecycle): This lifecycle is applicable the software development by using the Waterfall process which defined for the application development project as Waterfall application
software development by the Iterative process (Lifecycle): This lifecycle is applicable the software development by using the Iterative process which defined for the application development project as Iterative applicationSubgroups: Subgroup #01: Waterfall: This subgroup is applicable the software development by using the Waterfall process
19 People, 2 Basic Units
– software development by the Waterfall process
Subgroup #02: Iterative: This subgroup is applicable the software development by using Iterative process
19 People, 2 Basic Units
– software development by the Iterative process
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。
