Chengdu KT Electronic Hi-2017-tech Co., Ltd-2017-CMMI3

CMMI认证查询 cmmirz 9年前 (2017-09-07) 699次浏览 0个评论
Organization Name:
(组织名称)
Chengdu KT Electronic Hi-tech Co., Ltd
Organizational Unit:
(组织单位)
Design R&D Center
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Sep 08, 2017
Lead Appraiser:
(主任评估师)
Kiran Chaudhari
Sponsor:
(发起人)
Bo Yu
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Chengdu location is only considered for appraisal. Thus, location is not a differentiator and does not make any material difference to the way processes are applied.)
Customer (Not Relevant: Design and R&D Center develop products in Radio and television, communications industry. OSSP is defined at organization level and projects follow the same with minor tailoring irrespective of clients. Therefore ‘CUSTOMER’ factor is not considered for project selection.)
Size (Not Relevant: Project staff size varies based on scope and complexities of each Project. However, it has no impact of processes followed in projects. As per Management policy, each project has follow standard processes and hence “Size” factor is not considered for project selection.)
Organizational Structure (Not Relevant: Design and R&D Center is considered as OU. There is no other dept. engaged in software development. There is no impact from organizational structure on project process differentiation)
Type of Work (Not Relevant: At present all development are going on. So “Type of work” factor is not considered for project selection.)
Life-Cycle: Project follows different lifecycle methodologies like waterfall model, Hardware Product model, and Iterative & incremental model. OSSP has some differentiation due to lifecycle and hence “Lifecycle” factor is considered for project selection. At present, none of the project is using Hardware Product model life cycle.
Sampling Factor Values: Waterfall (Life-Cycle): Projects follow waterfall Model
Iterative & incremental (Life-Cycle): Projects follow iterative and incremental Model
Subgroups: 01: Waterfall Lifecycle Projects
18 People, 3 Basic Units
– Waterfall
02: Iterative & Incremental lifecycle Projects
16 People, 2 Basic Units
– Iterative & incremental

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Chengdu KT Electronic Hi-2017-tech Co., Ltd-2017-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址