Promptnow -2013-CMMI3

CMMI认证查询 cmmirz 12年前 (2013-04-28) 588次浏览 0个评论
Organization Name:
(组织名称)
Promptnow
Organizational Unit:
(组织单位)
Software Development Department
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Apr 29, 2013
Lead Appraiser:
(主任评估师)
Tachanun Kangwantrakool
Sponsor:
(发起人)
Natjira Honda
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The scope of appraisal is only Bangkok, Thailand– location so other locations are not considered for this appraisal.)
Customer (Not Relevant: The QMS processes are established at organizational level and processes are not differentiating with customers and the scope of appraisal is only Commercial customer type , There are no process distinctions made based on the customers)
Size (Not Relevant: All projects are averaged sizing, The QMS processes does not vary and different for different size of the projects. Projects which are used Team Size (FTE) more than 20 persons are not in the scope of appraisal)
Organizational Structure (Not Relevant: All projects are developed under only a division for SW development; therefore the QMS processes are not different for all projects under this organization. So this factor is not considered for project selection from all divisions. There are no process distinctions made based on the structure)
Type of Work (Not Relevant: There is only type of typical work conducted in the org/ QMS processes: SW development. The planned appraisal will only cover SW development projects)
Lifecycle: The SW development life-cycles are categorized into 2 life cycles types in the org. are covered for SW development in the organizational scope – 1) Waterfall_New project and 2) Waterfall _New Phase. The different procedures of works are considered in scope of appraisal only 2) Waterfall_new Phase.
Sampling Factor Values: software development by the Waterfall _New Phase (Lifecycle): This lifecycle is applicable the software development by using the Waterfall _New Phase which defined for the application enhancement project
software development by the Waterfall _New Project (Lifecycle): This lifecycle is applicable the software development by using the Waterfall _New Project which defined for the new development project
Subgroups: Subgroup #02: software development by the Waterfall _New Phase: This subgroup is applicable the software development by using the Waterfall _New Phase
22 People, 2 Basic Units
– software development by the Waterfall _New Phase

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Promptnow -2013-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址