SIE Consulting Co., Ltd.-2013-CMMI3

CMMI认证查询 cmmirz 12年前 (2013-06-08) 488次浏览 0个评论
Organization Name:
(组织名称)
SIE Consulting Co., Ltd.
Organizational Unit:
(组织单位)
Development Projects in SPD, OTD and PMD Department, Shunde Branch
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Jun 09, 2013
Lead Appraiser:
(主任评估师)
Chen Wang
Sponsor:
(发起人)
chengkang zhang
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant. Although there are 2 locations (Foshan of Guangdon, Wuxi of Jiangsu), but they do not cause significant differences in processes execution.)
Customer (Not Relevant: Not Relevant. Currently there is only one customer for the 6 projects in OU, and it will not cause process differences if other customers are involved.)
Size: Relevant. The tailoring guideline will cause process differences for different sizes of projects (Large project for over 600 man day, Small project for less than 600)
Organizational Structure (Not Relevant: Not Relevant. All 2 divisions and 1 department in OU follow the same processes.)
Type of Work (Not Relevant: Not Relevant. All projects are with the same type of work (software development).)
Life Cycle: Relevant. There are two types of life cycle used (Iteration, waterfall), which will cause differences such as task planning (including milestone and daily tasks) , baseline and product integration.
Product Lines: Relevant. Two product lines (self-developed, and Oracle-based) which will cause differences in engineering related processes.
Sampling Factor Values: Large (Size): Basic units with manpower over 600 man day
Small (Size): Basic units with manpower less than 600 man day
Iteration (Life Cycle): Basic unit with more than 1 release with the later release built on the previous ones.
Waterfall (Life Cycle): waterfall life cycle
Self-developed (Product Lines): Basic units with coding from scratch
Oracle-based (Product Lines): Basic units with codes using Oracle Platform (Form and Table based)
Subgroups: 1: Large project with Iteration and Oracle-based
12 People, 1 Basic Units
– Large
– Iteration
– Oracle-based
2: Small project with Waterfall and Self-developed
23 People, 4 Basic Units
– Self-developed
– Waterfall
– Small
3: Small project with Waterfall and Oracle-based
6 People, 1 Basic Units
– Small
– Waterfall
– Oracle-based

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:SIE Consulting Co., Ltd.-2013-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址