CSSI-2016-CMMI3

CMMI认证查询 cmmirz 9年前 (2016-01-28) 955次浏览 0个评论
Organization Name:
(组织名称)
CSSI
Organizational Unit:
(组织单位)
India Technology Center
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Jan 29, 2016
Lead Appraiser:
(主任评估师)
SrinivasaRao Tumu
Sponsor:
(发起人)
Sekhar Babu Madala
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are executed at single location i.e. India Technology Center, CSSI, Hyderabad. Hence location is not an influencing factor.)
Customer (Not Relevant: Projects are executed for multiple customers. However process implemented is consistent across types of projects irrespective of customer. Hence customer is not an influencing factor.)
Size (Not Relevant: Projects implemented in the OU are of similar size. Hence size is not an influencing factor.)
Organizational Structure (Not Relevant: OU is organized as a single unit and projects are implemented in the same unit. Hence org structure does not influence the process.)
Type of Work: (Relevant: Type of work i.e. Development / Maintenance / Implementation influences the process as three different types of projects (Development Projects, Maintenance Projects and Implementation projects) are executed in the OU.)
Sampling Factor Values: Dev (Type of Work): Projects of Development nature.
Maint (Type of Work): Projects of Maintenance nature.
Impl (Type of Work): Projects of Implementation nature.
Subgroups: ITC – Dev: ITC – Dev subgroup is responsible for development projects in the areas of Insurance, Healthcare and Financial Services. The development process starts with requirements gathering from the client then implements the design, develops code, and validates the application with testing before going for deployment of the end application by effectively implementing various development life cycles.
38 People, 3 Basic Units
– Dev
ITC – Maint: ITC – Maint subgroup is responsible for maintaining projects, once they go live. Maintenance involves support, enhancements, issues and changes received from the clients. The maintenance process starts from any changes/Issues raised from the client then assess the impact on the application and subsequent changes to be implemented in requirements, design, coding of existing application. Before going for deployment, testing is done for the changes made.
45 People, 10 Basic Units
– Maint
ITC – Impl: CSSI has implementation projects for in house VUE product. They are classified into customizations and configurations. Implementation starts with demonstration of product to the customer and then assess the product and customer requirements. Any changes to the code is required then it is considered as a customizations or else they are configurations. Customizations involves design, coding, Integrations and testing. Configurations involves Integrations and testing.
11 People, 1 Basic Units
– Impl

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:CSSI-2016-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址