Organization Name:
(组织名称) LANGFANG DEVELOPMENT ZONE CHINA PETROLEUM LONGHUI AUTOMATION ENGINEERING CO., LTD.
(组织名称) LANGFANG DEVELOPMENT ZONE CHINA PETROLEUM LONGHUI AUTOMATION ENGINEERING CO., LTD.
Organizational Unit:
(组织单位) Langfang Development Zone, China Petroleum Longhui Automation Engineering Co., Ltd. Beijing Science and Technology Branch
(组织单位) Langfang Development Zone, China Petroleum Longhui Automation Engineering Co., Ltd. Beijing Science and Technology Branch
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Mar 12, 2013
(评估结束日期) Mar 12, 2013
Lead Appraiser:
(主任评估师) Dixie Dice
(主任评估师) Dixie Dice
Sponsor:
(发起人) Guodong Li
(发起人) Guodong Li
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: All Basic Units within the Beijing Technology Branch perform their tasking at the Beijing site. As such, there are not differences in implementation in terms of location. This Sampling Factor is not relevant.)
Customer (Not Relevant: The organizational unit has three customers PetroChina, CNOOC and Sinopec. The parent company is a subsidiary company of PetroChina. So there are some different processes to dealing with group”s internal customers. The customers of the 4 current projects are all PetroChina Group internal companies; therefore this Sampling Factor is not relevant at this time.)
Size: Small Projects (reviews are informal, mtgs are not required; Class A1/A2 based only on number of on human resource requirements): – Class A1: less than 3 person-months workload – Class A2: workload ranged from 3 months to 10 months Medium/Large Projects(reviews must be formal; Class B/C based only on number of human resource requirements): – Class B: workload between 10-50 man-months – Class C: workload in 50 Individual months or more
Organizational Structure (Not Relevant: All resources are matrixed from the organization for each Basic Unit, therefore this Sampling Factor is not relevant.)
Type of Work (Not Relevant: All projects perform the same type of work: system development; therefore this Sampling Factor is not relevant.)Sampling Factor Values: Medium/Large Projects (Size): Medium/Large Projects (reviews must be formal; Class B/C based on human resource requirements): – Class B: workload between 10-50 man-months – Class C: workload in 50 Individual months or more
Small Projects (Size): Small Projects (reviews are informal, mtgs are not required; Class A1/A2 based on human resource requirements): – Class A1: less than 3 person-months workload – Class A2: workload ranged from 3 months to 10 monthsSubgroups: Medium/Large Projects: Class C: Workload of more than 50 man-months
16 People, 3 Basic Units
– Medium/Large Projects
Small Projects: Class A1/A2: Less than 3 person-months workload to 10 months
3 People, 1 Basic Units
– Small Projects
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。