Organization Name:
(组织名称) General Dynamics Ordnance Tactical Systems, Precision Systems
(组织名称) General Dynamics Ordnance Tactical Systems, Precision Systems
Organizational Unit:
(组织单位) Healdsburg Operations
(组织单位) Healdsburg Operations
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Jul 27, 2018
(评估结束日期) Jul 27, 2018
Lead Appraiser:
(主任评估师) Jesse Foster
(主任评估师) Jesse Foster
Sponsor:
(发起人) John Dennison
(发起人) John Dennison
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Location is not a factor because both facilities that comprise GD-OTS Healdsburg Operations are in the area and are managed as one from the Healdsburg site.)
Customer (Not Relevant: Customer is not a factor impacting how work is performed. Customers are generally other defense contractors developing defense systems for the government.)
Size (Not Relevant: Size is not a factor. All externally funded development and production programs are expected to use the same standard processes tailored to meet their needs.)
Organizational Structure (Not Relevant: Organizational structure is not a factor because all programs use the same organizational infrastructure, guidance, and support resources.)
Type of Work: There are two major types of work performed by GD-OTS-Healdsburg: Production and DevelopmentSampling Factor Values: Production (Type of Work): The production work at Healdsburg includes engineering and manufacturing of items designated in the Full Rate Production stage of the acquisition lifecycle.
Development (Type of Work): Work being performed in the Engineering Manufacturing and Development (EMD) phase of the acquisition lifecycle are designated as Development work.Subgroups: Development Work: Development – Work being performed in the Engineering Manufacturing and Development (EMD) phase of the acquisition lifecycle are designated as Development work.
24 People, 1 Basic Units
– Development
Production: Projects/programs that are in the Full Rate Production (FRP) or Low Rate Initial Production (LRIP) phases.
53 People, 2 Basic Units
– Production
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。
