Giesecke & Devrient India Pvt Ltd.-2016-CMMI3

CMMI认证查询 cmmirz 10年前 (2016-10-09) 894次浏览 0个评论
Organization Name:
(组织名称)
Giesecke & Devrient India Pvt Ltd.
Organizational Unit:
(组织单位)
Mobile Security - Design Centre India, Pune
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Oct 10, 2016
Lead Appraiser:
(主任评估师)
Ashok Sontakke
Sponsor:
(发起人)
Sameer Prabhu
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The scope of appraisal is only Pune location)
Customer (Not Relevant: The QMS processes are established at organizational level and processes are not differentiating with customer.)
Size (Not Relevant: The QMS processes does not vary and different for different size of the projects.)
Organizational Structure (Not Relevant: For “Design Centre India” Following functions/activities are carried out at organizational Level. # Software Engineering Process Group (SEPG) # Software Quality Assurance (SQA) # Training Function (OT))
Type of Work (Not Relevant: There are only one major type of work : Software Development)
Lifecycle: Software development work is considered in scope of appraisal. Projects are executed using Waterfall and Agile. Separate processes are defined for all lifecycles. Since sets of processes are different for waterfall and Agile this factor is considered for the sampling factor.
Sampling Factor Values: Waterfall (Lifecycle): In “The Waterfall” approach, the whole process of software development is divided into separate process phases. The phases in Waterfall model are: Requirements Analysis, Software Design, Coding and Testing & Maintenance. In a waterfall model, each phase must be completed in its entirety before the next phase can begin
Agile (Lifecycle): Agile methods break tasks into small increments with minimal planning, and do not directly involve long-term planning. Iterations are short time frames (time boxes) that typically last Two weeks. Each iteration involves a team working through a full software development cycle including planning, requirements analysis, design, coding, unit testing, and acceptance testing when a working product is demonstrated to stakeholders. Multiple iterations may be required to release a product or new feature
Subgroups: Waterfall: Projects following waterfall lifecycle
91 People, 5 Basic Units
– Waterfall
Agile: Projects following Agile Lifecycle
34 People, 3 Basic Units
– Agile

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Giesecke & Devrient India Pvt Ltd.-2016-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址