GuiZhou Electric Power Design & Research Institute-2017-CMMI

CMMI认证查询 cmmirz 9年前 (2017-04-26) 916次浏览 0个评论
Organization Name:
(组织名称)
GuiZhou Electric Power Design & Research Institute
Organizational Unit:
(组织单位)
Geographic Information Center, Technical Quality Dept, Information and Printing Dept
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Apr 27, 2017
Lead Appraiser:
(主任评估师)
yongming Zhang
Sponsor:
(发起人)
xi Ren
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: No influence on the process implementation because all work is done in Guiyang.)
Customer: Land management,electric transmission line icing,electric transmission line windage.
Size (Not Relevant: No influence on the process implementation, less than or equal to 10 persons.)
Organizational Structure (Not Relevant: No influence on the process implementation because all projects are developed within Geographic Information Center.)
Type of Work (Not Relevant: Only software development)
Sampling Factor Values: icing (Customer): Monitoring for overhead transmission line icing, daily work report of icing,model computing,GIS demonstration,short message alarm.
windage (Customer): Adjustment for overhead transmission line windage.
lanmtg (Customer): Provides overall solution for highway, including land resources management, collection for industrial distribution,logistics and highway network planning.
Subgroups: SG1: Data processing, GIS demonstration and statistical analysis for overhead transmission line icing.
12 People, 2 Basic Units
– icing
SG2: Based on different tower-type,adjusting overhead transmission line windage for power grid customer.
20 People, 3 Basic Units
– windage
SG3: Land resources management and navigation for highway.
15 People, 2 Basic Units
– lanmtg

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:GuiZhou Electric Power Design & Research Institute-2017-CMMI
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址