HEFEI iFLY Digital Technology CO.,LTD.-2018-CMMI3

CMMI认证查询 cmmirz 8年前 (2018-03-11) 893次浏览 0个评论
Organization Name:
(组织名称)
HEFEI iFLY Digital Technology CO.,LTD.
Organizational Unit:
(组织单位)
Research & Development Department
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Mar 12, 2018
Lead Appraiser:
(主任评估师)
Lester Stamnas
Sponsor:
(发起人)
YanBing Yu
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All Basic Units within the R&D Center perform their tasking at the Hefei city site. As such, there are not differences in implementation in terms of location.)
Customer (Not Relevant: Regardless of shrink wrap / product purchases by government, industry or commercial. Contract customers: There is no difference based on government, industry or commercial customer. Therefore, this sampling factor is not relevant.)
Size (Not Relevant: Size not relevant to project’s process. Focus is on ensuring requirements are clear, (All projects are between 6 and 25 man-months. The size difference is minimal and does not affect the way the projects implement the processes))
Organizational Structure (Not Relevant: All the basic units fit within the same R&D Center. No differences among projects in org reporting)
Type of Work: Type of Work: Differences of life cycle are based on product. Contract: Customized software application for specific client. Product: Develop product for domain application. Unit test only in Contract Project, or care is taken to review requirements with customer, and preliminary and detailed design, system test and acceptance test separate.
Lifecycle: Waterfall: If requirements clear, requirements phase can be held to 2 weeks, and preliminary and detailed design can be integrated together, Iterative: the iterative process and scope division is more complex, the project process management is more detailed
Sampling Factor Values: Contract (Type of Work): Contract with customer for a specific development project and with maintenance. Customers perform requirements validation and elicitation activities with company. Both Unit test and code review only in Contract Project. Validation activities are performed in requirements development, design (use both preliminary and detailed design), and validation processes. Integration and verification processe
Product (Type of Work): Internal project for sale off the shelf: Internal requirements review with Sales Dept. Unit Test OR Code review selectable. Preliminary and detailed design selectable. User satisfaction surveys were tailored out in Product Project. System and acceptance test combined. “Shrink wrap”
Waterfall (Lifecycle): Waterfall: If requirements clear, requirements phase can be held to 2 weeks, and preliminary and detailed design can be integrated together,
Iterative (Lifecycle): Iterative: the iterative process and scope division is more complex, the project process management is more detailed and will require more than one build or release, when requirements are less clear.
Subgroups: Contract / Waterfall: Contract/ Waterfall Develop customized software application for specific client
27 People, 3 Basic Units
– Contract
– Waterfall
Product / Waterfall: Product type using waterfall model:Develop product for domain application
11 People, 1 Basic Units
– Waterfall
– Product

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:HEFEI iFLY Digital Technology CO.,LTD.-2018-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址