Organization Name:
(组织名称) Ingenia
(组织名称) Ingenia
Organizational Unit:
(组织单位) Software Applications Unit
(组织单位) Software Applications Unit
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Mar 28, 2019
(评估结束日期) Mar 28, 2019
Lead Appraiser:
(主任评估师) Jose Sancho Thomas
(主任评估师) Jose Sancho Thomas
Sponsor:
(发起人) JOSE MATAS
(发起人) JOSE MATAS
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Location is not a relevant factor, becuase all projects used the same methodology independly of the location.)
Customer (Not Relevant: All projects used the same Quality System independently of the customer. Sometimes, customer requires to use some specific tools or templates, in this case the quality assurance department evaluates them and approves it use if they are allign with the methodology. That is why customer is not a relevant factor.)
Size (Not Relevant: The methodology does not make any distintion or tailoring based on size, so size is not a relevant factor.)
Organizational Structure (Not Relevant: All projects follow the same tools, templates and processes independly of the organizational structure, so the organizational structure is not a relevant factor.)
Type of Work: Type of work is a sampling factor because the quality system describes different tools, methods and documentation to be used depending on the type of work (V Development and Agile)Sampling Factor Values: V-Development Projects (Type of Work): Projects developed using waterfall lifecycle
Incremental Projects (Type of Work): Projects developed using agile methodologiesSubgroups: V Life Cycle Development: Sequence of steps in the development life cycle of a project. The left side of the V represents the breakdown of the needs, and the creation of system specifications. The right side of the V represents the integration of parts and verification. V means “verification and validation”. It is very similar to the classical cascade model as it is very rigid and contains a lot of iterations.
35 People, 2 Basic Units
– V-Development Projects
Incremental Life Cycle Development: Planning a project in different time blocks is called iteration. In one iteration a particular work process that provides a more complete for a final product results, so that whoever uses it receives benefits of this project increasingly repeated.
45 People, 6 Basic Units
– Incremental Projects
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。
