Intergraph España S.A.-2014-CMMI2

CMMI认证查询 cmmirz 10年前 (2014-02-24) 469次浏览 0个评论
Organization Name:
(组织名称)
Intergraph España S.A.
Organizational Unit:
(组织单位)
Software Factory of SG&I Spain
Maturity Level:
(成熟度)
Maturity Level 2
Appraisal End Date:
(评估结束日期)
Feb 25, 2014
Lead Appraiser:
(主任评估师)
Jose Sancho Thomas
Sponsor:
(发起人)
Marcos Picardo
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects used the same Quality System independently of the location, size or organizational structure.)
Customer: The customer is a sampling factor because is given coverage to two different systems (SIGRID and SINTEGRA).
Size (Not Relevant: All projects used the same Quality System independently of the location, size or organizational structure.)
Organizational Structure (Not Relevant: All projects used the same Quality System independently of the location, size or organizational structure.)
Type of Work: There are four different types of work (Corrective Maintenance, Enhancement Maintenance with Functional Analysis, Enhancement Maintenance without Functional Analysis and Support). Differnt tools and adaptations of the methodology are used for each one.
Sampling Factor Values: SIGRID (Customer): Network inventory system for distribution electrical network
SINTEGRA (Customer): Integration system to view/analyze information from different data sources (network, SAP, CIS…).
Corrective Maintenance (Type of Work): Activities to analyze, correct and test a discovered issue in an existing application/system.
Enhancement Maintenance with Functional Analysis (Type of Work): Activities to prepare an estimation, functional analysis, design, build, test and document a change request enhancement.
Enhancement Maintenance without Functional Analysis (Type of Work): Activities to prepare an estimation, design, build, test and document a change request enhancement.
Support (Type of Work): Activities to support existing applications/systems (operation and end users support): • Helpdesk • Data correction • Process revision • Data loading
Subgroups: SIGRID – Corrective Maintenance: Activities to analyze, correct and test a discovered issue in an existing development in SIGRID system
7 People, 1 Basic Units
– SIGRID
– Corrective Maintenance
SIGRID – Enhancement Maintenance with Functional Analysis: Activities to prepare an estimation, functional analysis, design, build, test and document a change request enhancement in SIGRID system
7 People, 3 Basic Units
– Enhancement Maintenance with Functional Analysis
– SIGRID
SIGRID – Enhancement Maintenance without Functional Analysis: Activities to prepare an estimation, design, build, test and document a change request enhancement in SIGRID system
7 People, 2 Basic Units
– SIGRID
– Enhancement Maintenance without Functional Analysis
SIGRID – Support: Activities to support existing SIGRID system (operation and end users support): • Helpdesk • Data correction • Process revision • Data loading
3 People, 1 Basic Units
– Support
– SIGRID
SINTEGRA – Enhancement Maintenance with Functional Analysis: Activities to prepare an estimation, functional analysis, design, build, test and document a change request enhancement in SINTEGRA system
4 People, 3 Basic Units
– SINTEGRA
– Enhancement Maintenance with Functional Analysis

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Intergraph España S.A.-2014-CMMI2
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址