L3Harris-2020-CMMI3

CMMI认证查询 cmmirz 2个月前 (06-10) 35次浏览 0个评论
Organization Name:
(组织名称)
L3Harris
Organizational Unit:
(组织单位)
Communication Systems West - Design and Development
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Jun 11, 2020
Lead Appraiser:
(主任评估师)
Thayne Hill
Sponsor:
(发起人)
Kent Johnson
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: No discernible process execution differences due to geographical location. All projects are located at the Salt Lake City facilities in Utah. All design and development projects utilize and comply with the organizational standard set of processes and assets.)

Customer (Not Relevant: No discernible process execution differences due to Customer Classification. All active design and development projects meeting the criteria have a government customer type. All development projects utilize and comply with the organizational standard set of processes and assets. There are no unique process requirements imposed by the customer base.)

Size: Process execution can vary due to differences in the size of design and development projects. Organizational process requirements differ and waivers are allowed for “small” design and development projects. The organization categorizes the project as small if the FTE Count is less than 14 or is a considered a “Full Rate Production / Mature Product” project that is less than $10M.

Organizational Structure (Not Relevant: No discernible process execution differences due to the type of work. The design and development projects are distributed among 3 business unit domains that correlate to a logical division of work for management purposes. Each business unit and all development projects within utilize the same lifecycle and comply with the organizational standard set of processes and assets.)

Type of Work (Not Relevant: No discernible process execution differences due to the type of work within the Organizational Unit identified. All development efforts considered to be design and development projects utilize the defined lifecycle and complying with the organizational standard set of processes and assets.)

Sampling Factor Values: Large Project (Size): 14 or more FTEs

Small Project (Size): 13 or less FTEs

Subgroups: Design and Development – Large: Design and Development projects develop products in accordance with all established organizational processes within all lifecycle phases.
262 People, 8 Basic Units
– Large Project

Design and Development – Small: Design and Development projects that are less than specified dollar amounts or small FTE counts that develop products in accordance with modified / waivered / optional organizational processes.
129 People, 15 Basic Units
– Small Project


版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:L3Harris-2020-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址